Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
18/06/2025

Siguenos en:

facebook twitter

 

Home ›

Energía

ENDESA writes up a project to palliate the damages that causes to the Eume river

Fri, 23/04/2010 (La Opinión. A Coruña)

The prosecution denounces to Endesa to leave dry 3 kilometers of the Eume river

Thu, 22/04/2010 (La Voz de Galicia)

Lula will build the third major dam of the world in the Amazonas river

Wed, 21/04/2010 (El País)

Iberdrola starts the emptying of the Sil to extend the hydroelectric plant of Santo Estevo

Mon, 19/04/2010 (La Voz de Galicia)

Experts will participate in Las Palmas of Gran Canaria in a course of desalination with renewable energies

Thu, 15/04/2010 (Europa Press)

The volume of flow lets grow a 136% the hydroelectric production

Wed, 14/04/2010 (Diario de León)

Iberdrola will not delay the emptying of Sil in spite of the protests of the fishermen

Tue, 13/04/2010 (Faro de Vigo)

Santo Estevão emptying is delayed by the high level of the Sil river

Fri, 09/04/2010 (La Voz de Galicia)

CIRCE Foundation will evaluate the energy consumption of the Integral Cycle of Water in Zaragoza

Fri, 09/04/2010 (Europa Press)

The project of a new prey in the Navia river leaves to public information

Thu, 08/04/2010 (El Comercio)

  • « first
  • ‹ previous
  • …
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad