Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
09/06/2025

Siguenos en:

facebook twitter

 

Home ›

Energía

The Ministery of Environment drives the hydroelectric plants of Chira, Niñas and Soria

Tue, 30/03/2010

One million euros by drink water

Thu, 25/03/2010 (La Verdad)

Simulations to reduce the effect of floods

Mon, 22/03/2010

Iberdrola will begin to dry the Sil river the 5 of April and will take about 40 days

Thu, 18/03/2010

The Xunta admits that ENDESA maintained the river Eume dry during half century

Mon, 08/03/2010 (El País)

The Menjú hydroelectric close due tu abandoment

Tue, 02/03/2010 (La Opinión de Murcia)

The CREA anticipates a demand for 5684 hectometres in 2020

Tue, 02/03/2010 (El Periódico de Aragón)

Romeo believes that there is still no technology that can replace a massive hydroelectric

Thu, 25/02/2010 (Europa Press)

Environmental authorization to a mini-power station in the Miño river

Tue, 16/02/2010

Adega is against to the extension of the San Pedro´s dam in the Sil river

Thu, 11/02/2010 (El Correo Gallego)

  • « first
  • ‹ previous
  • …
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad