Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
16/05/2025

Siguenos en:

facebook twitter

 

Home ›

energía

Mequinenza hydroelectric plant, in the dam of greater capacity of the Ebro

Mon, 21/06/2010 (La Vanguardia)

The reduction of the river´s volume threatens the hydroelectric sector

Wed, 09/06/2010

Fenosa asks license to extend the dams of Os Peares and Belesar

Tue, 01/06/2010 (El Progreso)

The construction of a prey in the Eo river mobilizes the population

Tue, 01/06/2010 (El Progreso)

Iberdrola finishes the discharge of Santo Estevo and leaves the dam to 30% of it´s capacity

Wed, 26/05/2010 (La Voz de Galicia)

A businessman tries to operate a mini power station in the Eo river

Tue, 25/05/2010 (La Nueva España)

The Goverment blames to Iberdrola of the mud that dyes the Miño river

Thu, 20/05/2010 (El País)

Iberdola finalizes the emptying of the Santo Estevo´s preys to enlarge

Wed, 19/05/2010 (El Progreso)

A mini power station puts in alert to the Eo river

Tue, 18/05/2010 (El País)

The MARM separates the dam with the extension of the power station of Santo Estevo

Sat, 15/05/2010 (ABC)

  • « first
  • ‹ previous
  • …
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad