Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
05/03/2026

Siguenos en:

Linkedin X

 

Home ›

Obras hidráulicas

"With the divert, Murcia would have had restrictions"

Sat, 17/09/2005 (Heraldo de Aragón)

Tajo farmers will ask for 76 hectometres for Autumn

Sat, 17/09/2005 (La Verdad)

The Water Commission will analyze all the alternatives about Biscarrués

Sat, 17/09/2005 (Heraldo de Aragón)

Narbona (Environmental Minister) will base her decision about the Júcar-Vinalopó in the price and effectiveness

Fri, 16/09/2005 (El País)

Asaja-Murcia makes an study about the hydric situation of the region to know the infrastructure condition

Mon, 19/09/2005 (Europa Press)

The Júcar swamps are technically empty

Fri, 16/09/2005 (Levante)

The Sau swamp will be emptied by the Water Agency to improve the water quality

'The ecologic flow of the Ebro must be fixed by all the basin'

Fri, 16/09/2005 (Heraldo de Aragón)

Narbona (Environmental Minister) will visit tomorrow in Valencia the modernization works of the Acequia Real del Júcar

Wed, 14/09/2005

The Water Agency says that the divert would keep the quality of the hydric resources of the Ter-Llobregat

Fri, 16/09/2005 (El Periódico)

  • « first
  • ‹ previous
  • …
  • 400
  • 401
  • 402
  • 403
  • 404
  • 405
  • 406
  • 407
  • 408
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad