Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
09/06/2025

Siguenos en:

facebook twitter

 

Home ›

pontevedra

An exhibition detailing the proposed new wastewater treatment plant in Vigo (Pontevedra)

Mon, 11/02/2013 (Ministerio de Agricultura, Alimentación y Medio Ambiente)

The project of water of the estuary supply passes the environmental review

Mon, 11/06/2012 (Faro de Vigo)

The occupation of the reservoir of A Baxe remains stagnant at 67% despite last rains

Wed, 18/04/2012 (Diario de Pontevedra)

The highest level of water stored does not prevent that cyanobacteria increases

Tue, 27/03/2012 (Diario de Pontevedra)

Caldas will have an alternative catchment in six month

Fri, 13/01/2012 (La Voz de Galicia)

The toxic algae reappearances in the catchment of Segade's water and it rises in the reservoir of Umia

Thu, 12/01/2012 (La Voz de Galicia)

Acuanorte will built a new reservoir of 2,500 cubic meters in the area Cadrelo

Wed, 11/01/2012 (Diario de Pontevedra)

The water treatment works in the Caldas will begin in early 2012

Wed, 07/12/2011 (Faro de Vigo)

Environment delayed start of construction of the new collection of Caldas

Thu, 01/12/2011 (Diario de Pontevedra)

The Ministry of Environment adjudges five hydraulics works in A Coruña, Ourense and Pontevedra by an import around one million euros

Sun, 06/09/2009 (Europa Press)

  • 1
  • 2
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad