Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
05/07/2025

Siguenos en:

facebook twitter

 

Home ›

hidrológico

A failure to prevent the water from the dam Quentar, which will be operational in about three months

Wed, 11/02/2009 (Europa Press)

PAR pide una reunión de la Comisión de Seguimiento del Pacto del Agua para conocer el estado de ejecución de las obras

Wed, 11/02/2009 (Europa Press)

Thousands of irrigators against the end of the Tajo-Segura transfer

Sat, 07/02/2009 (El Mundo)

The reservoir "La Loteta" has already begun filling, a phase which will last ten months

Sat, 07/02/2009 (Europa Press)

Swamps are andalusia andalusian 45.58 percent of its capacity by almost 10 percent more than in February 2008

Fri, 06/02/2009 (Europa Press)

Espinosa says that the Valdecañas transfer is not in study

Tue, 03/02/2009 (El Periódico de Extremadura)

The last storm has increase more than 1,000 hm3 into reservoirs, which exceeded 50% for the first time in six months

Wed, 28/01/2009 (Europa Press)

Director of Water does not exclude the possibility of Tagus transfer to ensure the demand

Wed, 28/01/2009 (Europa Press)

The dams from Toledo have increased 4 hectometres so its reserves store 212 cubic hectometres

Tue, 27/01/2009 (Europa Press)

Costa said that the reductions in flow transfer of Tajo-Segura would kill the agriculture in Alicante

Tue, 20/01/2009 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad