Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
27/05/2022

Siguenos en:

facebook twitter

 

Home ›

confederación hidrográfica del ebro

The CHE awarded proceedings conditioning in the river Vero, at the height of Barbastro, and Ésera, Graus

Wed, 23/01/2008 (Europa Press)

The CHE concludes the first studies to characterize the habitat of the European mink in the Ebro basin

Wed, 31/10/2007 (Europa Press)

The Plan of Water Sanitation will eliminate parasitic waters and will manage storm waters

Tue, 09/10/2007 (Europa Press)

Jose Luis Alonso regrets the rain reduction in Pyrenean and the Iberian, but he says that the irrigation campaign is normal

Wed, 03/10/2007 (Europa Press)

Program and calendar of the future Hidrologic Plan leaves to public information

Fri, 27/07/2007 (EFE)

The first draft of the dam of Biscarrués will not be finished before 2008

Sun, 15/07/2007 (Heraldo de Aragón)

The CHE today begins to review the defensive walls of the Ebro

Tue, 10/07/2007 (EFE)

The CHE bids on the writing of the work project of to repair of the New Channel of Civán, in Caspe

Fri, 06/07/2007 (Europa Press)

ENDESA opens to the floodgates in Talarn when filling 94% to alleviate to water by defrosting and last storms

Sun, 20/05/2007 (Diari Segre)

The CHE assumes the management of the dam of San Bartholome, in Ejea, and the Integra in the system of Bardenas

Sat, 12/05/2007 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad