Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
17/02/2026

Siguenos en:

facebook twitter

 

Home ›

Obras hidráulicas

The Sil river will have his usual flow in two weeks after five months without water

Tue, 19/10/2010 (El Progreso)

The new Hydrologic Plan places the Lérez as one of the rivers with more alterations in his banks

Mon, 18/10/2010 (Faro de Vigo)

A scientific report notices that the dredge of the Guadalquivir would affect negatively to the estuary

Sat, 16/10/2010 (Europa Press)

Environmental remediation stars the Third Congress of the Canal de Castilla

Mon, 18/10/2010 (La Razón)

Adega bets to leave free the Umia river even without demolishing the dam

Thu, 14/10/2010 (Diario de Pontevedra)

The Ministery of Environment begins the tests of the dam from where the Jucar will distribute water

Thu, 14/10/2010 (Información)

The water reaches as Vinalopó

Sun, 10/10/2010 (Las Provincias)

The Generalitat Valenciana will invest over 5.6 billion euros in the reform of the WWTP Turís I

Tue, 12/10/2010

Augas Galicia allocated 400.000 euros to emergency actions on the Sar river

Fri, 08/10/2010 (Europa Press)

Environment invest 8 million euros in the restoration of the lagoon of the Toll

Thu, 07/10/2010 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad