Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
23/06/2025

Siguenos en:

facebook twitter

 

Home ›

iberdrola

The emptying of the Sil arrives to the ecuador without biological damages, according to Iberdrola

Tue, 04/05/2010 (La Voz de Galicia)

Santo Estevão has emptied in a week 53 million liters

Tue, 27/04/2010 (La Voz de Galicia)

Iberdrola starts the emptying of the Sil to extend the hydroelectric plant of Santo Estevo

Mon, 19/04/2010 (La Voz de Galicia)

Iberdrola will not delay the emptying of Sil in spite of the protests of the fishermen

Tue, 13/04/2010 (Faro de Vigo)

Santo Estevão emptying is delayed by the high level of the Sil river

Fri, 09/04/2010 (La Voz de Galicia)

One million euros by drink water

Thu, 25/03/2010 (La Verdad)

Iberdrola will begin to dry the Sil river the 5 of April and will take about 40 days

Thu, 18/03/2010

Adega is against to the extension of the San Pedro´s dam in the Sil river

Thu, 11/02/2010 (El Correo Gallego)

Ecological denunciation against a new project of Iberdrola in the Sil river

Sun, 07/02/2010

The rains elevate the hydroelectric production

Tue, 02/02/2010 (La Opinión. El Correo de Zamora)

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad