Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
10/06/2025

Siguenos en:

facebook twitter

 

Home ›

hidroelectricidad

The indigenous communities of the Amazonia announce protests by the construction of new dams

Wed, 28/10/2009 (Europa Press)

Postponed by the drought the operation of the prey of the Three Throats

Sun, 25/10/2009 (EFE)

The PSOE announces in the Senate that will not grant new preys in the Miño river

Thu, 22/10/2009 (Faro de Vigo)

The Miño´s river basin is the most saturated in Europe in the number of reservoirs and dams

Wed, 21/10/2009 (La Voz de Galicia)

The Ministery of Enviroment will control that the hydroelectric plants meet the environmental conditions

Wed, 14/10/2009 (EFE)

The Senate refuses to restrain the hydroelectric exploitation of the river basins of the Sil and Miño

Thu, 08/10/2009 (La Voz de Galicia)

The hydraulic energy almost doesn't generate electricity in our country

Wed, 07/10/2009

Elena Espinosa emphasizes that the concession of hydroelectric plants by the MARM respects the principles of legality, sustainability and public interest

Wed, 23/09/2009

Villar Mir will invest 560 million to build four hydroelectric plants in China

Sun, 20/09/2009 (Europa Press)

China raises to the level of the prey Three Throats to arrive at total capacity

Wed, 16/09/2009 (EFE)

  • « first
  • ‹ previous
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad