Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
11/07/2025

Siguenos en:

facebook twitter

 

Home ›

energía

The prey of Yacyretá, with the water to the neck

Fri, 14/08/2009

Iberdrola extracts energy of the water in Brazil with two new plants of hydraulic energy

Mon, 10/08/2009

Agents of the Xunta have denounced to the public prosecutor the works in the Sil

Sun, 09/08/2009

The documentation about the works of Iberdrola in the Sil, is already in the Office of the public prosecutor

Fri, 07/08/2009 (El Correo Gallego)

Iberdrola initiates the new power station in the Sil without license

Tue, 04/08/2009 (El País)

The desalination plant of "Torrevieja" will be delayed two years due to lack of electric power

Fri, 31/07/2009 (Información)

The BNG asks that the Galician rivers are declared free of new hydroelectric power stations

Tue, 28/07/2009 (Europa Press)

An ecological group has denounced to Iberdrola to dry the river Sil

Thu, 23/07/2009 (El País)

The BNG will not denounce the drying of the river Sil by Iberdrola

Tue, 21/07/2009 (El País)

The water, with the minister Elena Espinosa, and the energy, issues to treat in International University "Menéndez Pelayo"

Sun, 19/07/2009 (EFE)

  • « first
  • ‹ previous
  • …
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad