Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
23/09/2023

Siguenos en:

facebook twitter

 

Home ›

depósitos

Ponteareas begins work on water treatment station to operate in 2012

Thu, 16/12/2010 (Faro de Vigo)

The Colorado River flowed backwards for millions of years

Wed, 06/10/2010

The CHE tender the construction of a water point for extinguishing forest fires in an area of Jaca

Tue, 30/03/2010 (Europa Press)

Channel Volunteers installed a water treatment plant in Haitian children's camp

Sat, 06/03/2010 (EFE)

Clean edge to river sediment.

Thu, 04/02/2010 (El Diario Vasco)

The MARM invests 3.4 million Euros in the completion of the regulating deposit of the supplying from the prey of Iznájar, in Rute (Cordova)

Fri, 14/08/2009

The works of the pond water of Argañeda to supply Karrantza doubled their cost. Its construction is paralyzed by the council after the appearance of cracks and the instability of the terrain. The opposition supports this increase to 6 million provided th

Fri, 13/06/2008 (El Mundo)

Andalucía Government authorized an investment of 22.1 million to secure water supplies in 35 municipalities

Wed, 04/06/2008 (Europa Press)

"In Honduras rivers are the lasrgest in terms of volume, but water is lacking"

Fri, 14/09/2007 (El Correo)

The storm deposit of the Cabanyal will have a capacity of 14,030 cubic meters in normal conditions

Wed, 25/07/2007 (Europa Press)

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad