Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
04/06/2025

Siguenos en:

facebook twitter

 

Home ›

colector

The Board launches Brenes purification with an investment of 4.1 million euros

Tue, 14/12/2010

Inaugurated the installation of wastewater treatment Oteiza, Aberin, Morentin and Muniaín, the plant's Estella

Thu, 25/11/2010

The regional government completes the General Plan of drainage and water treatment

Mon, 14/03/2011

A rainwater collection system will prevent the collapse of the Verdugo River sewage

Wed, 09/03/2011

Environment prioritize next year water infrastructure works

Mon, 15/11/2010

Josep Puxeu visits collector works Noja-Arnuero that allow incorporation of both municipalities to Drainage of Marshes (Cantabria)

Fri, 03/09/2010

Environment invests more than 1.2 million in flood protection works in Almaden de la Plata

Thu, 26/08/2010

The regional government will invest about EUR 500,000 in environmental remediation of a bank of the river Miño in Os Peares

Tue, 27/07/2010 (Europa Press)

The desalination plant reaches the sea

Tue, 25/05/2010 (Información)

The Cabildo of Lanzarote intended 4 million waterworks

Tue, 18/05/2010 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad