Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
21/02/2026

Siguenos en:

Linkedin X

 

Home ›

Obras hidráulicas

CHS to improve water transfer installations to reduce water leaks

Sun, 19/08/2007 (La Verdad)

UAGA-COAG announces protests during autumn and winter to speed up Yesa enlargement works

Fri, 17/08/2007 (Europa Press)

Expoagua deviates Ebro flow to improve 'Puente de Piedra'

Sat, 18/08/2007 (Heraldo de Aragón)

UAGA to protest against enlarging Yesa dam delay

Wed, 15/08/2007 (El Periódico de Aragón)

Plan to make Ebro river navigable puts at risk consensus about Expo 2008

Wed, 15/08/2007 (ABC)

All 28 dams in Segura river, considered as 'maximum risk' in case of breakage

Mon, 13/08/2007 (La Verdad)

CHA demands an urgent visit of the Environment Commission of Cortes to works of the increase of Yesa

Fri, 10/08/2007 (Europa Press)

Environment bids on works of improvement of the supplying to the Mancomunidad of Vegas Altas, in Cáceres and Badajoz

Thu, 09/08/2007 (Europa Press)

Environment clarifies that the low channel of the Tajo river is due to a failure in a turbine of the Azután marsh

Thu, 09/08/2007 (Europa Press)

Acciona appropriates the construction of two desalination plants in Arab Emirates and Algeria

Tue, 07/08/2007 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 330
  • 331
  • 332
  • 333
  • 334
  • 335
  • 336
  • 337
  • 338
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad