Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
19/02/2026

Siguenos en:

facebook twitter

 

Home ›

Obras hidráulicas

Two dangerous dams of "Fenosa" lacks of the emergency plans

Tue, 07/04/2009 (El País)

Starts the works in the water purifier of the Gavia in Madrid

Tue, 07/04/2009

The MARM adjudges the works of preparation and reparation of infraestructures of irrigations in Aragon by 4.4 millions of euros

Sat, 04/04/2009 (Europa Press)

The ministery of environment approves the works of improving of the river Pisuerga

Sat, 04/04/2009

The CHD estimates campaign will run as normal in the Tera thanks to the volume of water stored

Fri, 03/04/2009 (Europa Press)

The Minister of the Environment will present in Santoña the documental about the dam of the river Ebro

Fri, 03/04/2009 (Europa Press)

The Commission of the Pact of the Water in Aragon will meet between end of May and principles of June

Tue, 31/03/2009 (Europa Press)

The safety measures in the prey of Forata (Valencia) are reinforced

Tue, 31/03/2009

The minister Espinosa said that is worth the investment of 210 million in the new dam at The Loteta

Tue, 31/03/2009 (Europa Press)

Is found in Luxor a channel and a wall to control the water of 3500 years ago

Sat, 28/03/2009

  • « first
  • ‹ previous
  • …
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad