Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
08/09/2025

Siguenos en:

facebook twitter

 

Home ›

abastecimiento

Fourth phase of water sanitation and water supply in Coo ("Los Corrales de Buelna")

Mon, 27/07/2009

Mexico will reduce the water supply during 10 months by shortage

Fri, 24/07/2009 (EFE)

Water and Progress say that the derogation of the transfers "Tajo-Segura" and the one of the Ebro, would suppose losses of 1000 million Euros

Fri, 24/07/2009 (Europa Press)

The marm establishes the bases of regulation for the grants to the plants of waste water treatment for desalination of seawater in the Canary Islands

Fri, 24/07/2009

The challenge of the FAO is to implant the water technology in the poor countries

Thu, 23/07/2009 (EFE)

A plan of hydraulic works will generate 552 jobs

Thu, 23/07/2009 (Córdoba)

The CVC demand to the institutions the creation of a Plan of hydraulic patrimony

Wed, 22/07/2009 (Europa Press)

The Catalan Autonomous Government admits a delay of 18 months in the retirement of muds of Flix

Tue, 21/07/2009 (El País)

The Water Consortium "Sierra de Cádiz" has realised a study of the local water supplying

Tue, 21/07/2009 (Diario de Cádiz)

The desalination plant of Tordera has helped to regenerate the natural aquifers

Tue, 21/07/2009 (El Periódico)

  • « first
  • ‹ previous
  • …
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad