Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
04/07/2025

Siguenos en:

facebook twitter

 

Home ›

tajo-segura

Cañete prepares discrepancies changes in water policy

Thu, 13/09/2012 (El País)

Approved by Decree of exceptional measures to mitigate the effects of channel outage left bank of the Tajo-Segura

Tue, 28/08/2012 (Confederación Hidrográfica del Segura)

IU asks PP and PSOE to change the rules of the Tajo-Segura transfer

Fri, 24/08/2012 (EFE)

CHS says Tajo-Segura canal "and meets all user requirements"

Tue, 31/07/2012 (EFE)

The PSOE requires Agriculture a solution to breaking the Tajo-Segura

Sat, 28/07/2012 (EFE)

Pastor supports the call for a definitive solution to the transfer fault

Thu, 26/07/2012 (EFE)

The CHS will all dry wells to meet the demands of irrigators

Tue, 24/07/2012 (La Razón)

The pass circuit of Ulea begin to supply water to the channel of the Tajo-Segura next week

Fri, 20/07/2012 (Confederación Hidrográfica del Segura)

Coastal warn that there are shortages in supply while transfer to Segura is doing

Fri, 13/07/2012 (EFE)

The Ministry will soon begin the repair of the channel tunnel on the left bank of the Tajo-Segura

Wed, 11/07/2012 (Ministerio de Agricultura, Alimentación y Medio Ambiente)

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad