Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
18/08/2025

Siguenos en:

facebook twitter

 

Home ›

obras

The CHS and six ecological associations of the river basin of the Safe one will work altogether for the restoration of the river

Tue, 04/09/2007 (Europa Press)

The Generalitat destines more than 80 million in works to palliate the effects of the drought

Wed, 05/09/2007 (EFE)

The Generalitat initiates works of the pumping station of water purified coming from the EDAR of Torrevieja

Mon, 03/09/2007 (Europa Press)

Ministry of Environment studies to trasvase water of the Tajo river to Murcia

Fri, 31/08/2007 (El Periódico de Extremadura)

The City council of Valladolid signs the contract to complete the second phase of the collector of El Carrascal

Thu, 30/08/2007 (Europa Press)

The Government will invest 19,000 million euros in recovering the life of the rivers

Wed, 29/08/2007 (Noticias de Gipuzkoa)

The Delegation of Leon will invest six million in the execution of 80 basic infrastructure works in different towns

Wed, 29/08/2007 (Europa Press)

The MAP will invest more than seven million in modernizing the irrigable of the Community of Regantes Carive of Malaga

Tue, 28/08/2007 (Europa Press)

Environment impels 43 new works for the urban residual water purification

Sat, 25/08/2007 (EFE)

The CHS cleans the channel of Segura river to avoid possible floods

Sat, 25/08/2007 (La Verdad)

  • « first
  • ‹ previous
  • …
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad