Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
10/09/2025

Siguenos en:

facebook twitter

 

Home ›

infraestructura hidráulica

The Castrovido Monitoring Committee will appeal the project

Tue, 20/12/2005 (Europa Press)

Desalination plants guarantees quality water and adjusts the supply and the demand, according to ACUAMED´s director

Wed, 21/12/2005 (Europa Press)

The water from the Tajo-Segura will be for human consumption and the Tablas de Daimiel

Wed, 21/12/2005 (Europa Press)

The construction of the Castrovido dam will start on February, with an elevation of 1.046 metres

Tue, 20/12/2005 (Europa Press)

The Proserpina dam is not roman, according to a five years research

Tue, 20/12/2005 (Hoy)

Asaja-Murcia demands for water diverts

Mon, 19/12/2005 (Europa Press)

Narbona: the swamps´ levels in the Tajo allows a new divert for human consumption

Mon, 19/12/2005 (EFE)

COOPERATION-ETHIOPIA Intermon and ADIF show in Spain the Ethiopia´s water problem

Fri, 16/12/2005 (EFE)

The Cabinet Meeting approves today the existing water exchanges between basins, like the Negratín-Almanzora

Fri, 16/12/2005 (Europa Press)

The Monitoring Committee of Castrovido will take legal actions if the irrigation of the PHN is not guaranteed

Thu, 15/12/2005 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad