Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
11/06/2025

Siguenos en:

facebook twitter

 

Home ›

duero

Environment will invest 312 million in the Duero River basin

Thu, 23/10/2008 (ABC)

The "Junta" will take over the management of the Duero in the next seven months

Thu, 16/10/2008 (Diario de León)

Reservoirs del Duero are to 67.1 percent of their capacity, 6.4 percentage points lower than for 2007

Fri, 01/08/2008 (Europa Press)

The president of the Meeting makes a call to the use responsible for the natural resources

Fri, 20/06/2008 (El Mundo)

Reservoirs of the Duero basin are at 83.4 percent of their capacity, 7.2 points less than last year

Fri, 20/06/2008 (Europa Press)

The CHD meet this month to the boards operating in the basin of the Duero to plan the campaign for irrigation

Thu, 06/03/2008 (Europa Press)

The reservoirs in the Basin Duero are to 47.2 percent, 28.7 points below the levels of 2007

Fri, 29/02/2008 (Europa Press)

The water reservoirs in the Basin of river Duero are on the 45.5 percent, 18 points below the levels of a year ago

Fri, 25/01/2008 (Europa Press)

The CHD declaring warning by shortages of reserves in the reservoirs of the system Carrion and prealerta in Adaja-Cega

Fri, 21/12/2007 (Europa Press)

Environment Ministry awarded the construction of the variants affected by the reservoir of Irueña (Salamanca)

Thu, 25/10/2007 (Europa Press)

  • « first
  • ‹ previous
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad