Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
10/05/2025

Siguenos en:

facebook twitter

 

Home ›

canal

An investment of 20 million Euros is approved to develop the third phase of the Navarra Channel

Wed, 05/05/2010

Irrigation of Upper Aragon approved a plan to improve water use

Sat, 01/05/2010 (Diario del Alto Aragón)

The reservoirs are at 80% capacity, 4 points less than a year ago

Thu, 08/04/2010 (EFE)

Tajo´s irrigators ask 170 Hm3 and remember the 70 were not sent for work

Wed, 17/03/2010 (EFE)

Turia reservoirs are filled and water required to be kept to Albufeira

Wed, 10/02/2010 (Levante)

The extension of the channel of Maria Cristina to avoid floods when it rains is studied

Tue, 26/01/2010 (La Verdad)

The old canal of the Aqueduct will be signalized like senderismo route

Tue, 19/01/2010 (Europa Press)

The MARM will invest another million Euros in the automatization of the Orellana´s channel (Cáceres and Badajoz)

Wed, 13/01/2010

The MARM adjudges the repair of the Channel of Aragon and Catalonia, between the partidor of Zaidín and Coll de Foix, by more than 1.7 million Euros

Fri, 18/12/2009

A “super river” separated Great Britain of Europe only 30000 years ago

Tue, 01/12/2009 (madrimasd.org)

  • « first
  • ‹ previous
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad