Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
06/06/2025

Siguenos en:

facebook twitter

 

Home ›

aragón

The Minister Rosa Aguilar said that the MARM works with "rigor and responsibility " in the record of reservoir Biscarrués

Wed, 09/02/2011

Riegos from Alto Aragón starts the irrigation campain with high hidrics needs and an insufficient water reserves

Tue, 15/03/2011

Courts handled the bill to create the PAR Aragonese Water Agency

Fri, 11/03/2011

The MARM adjudges the repair of the Channel of Aragon and Catalonia, between the partidor of Zaidín and Coll de Foix, by more than 1.7 million Euros

Fri, 18/12/2009

The campaign of irrigations and the precipitation shortage have emptied the Aragonese dams

Mon, 19/10/2009 (Heraldo de Aragón)

Aragon River Association criticizes the pressure about the dam Yesa

Fri, 02/10/2009 (Diario del Alto Aragón)

The CHE doesn´t guarantee the security in the navigation across the Imperial Channel

Fri, 17/07/2009 (Heraldo de Aragón)

The ministry of Environment will invest 1 million Euros in the City of the Water

Sat, 18/07/2009

Alfredo Bone, appointed member of the World Water Council

Mon, 01/06/2009 (Europa Press)

The dam of Biscarrues will be finished in 2014

Thu, 28/05/2009

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad