Water Supply Project (02)
Inicio del proyecto: Mar, 27/04/1982
Finalización del proyecto: Mar, 31/03/1992
The Second Water Supply Project includes: (i) investments in the Abidjan system to increase water production facilities, increase storage capacity, provide for a 7 km transmission main and reinforcing the distribution system, as well as continuation of studies on available groundwater resources and study of a centralized production and water pressure control system; (ii) about 300 km of distribution extensions in 51 secondary centers; (iii) about 10,000 house connections to provide service for poor segments of the population under the social connection program; (iv) about 300 drilled village wells; (v) consultants services to carry out sector studies, land surveys, project supervision, technical assistance to DCH and FNH and training; and (vi) supply and installation of computer equipment for the Cadastre and property tax administration.