Jump to Navigation
CEDEX
SEMIDE
News
Home

Hispagua Sistema Español de Información sobre el Agua

  • English
  • Español
04/10/2025

Siguenos en:

facebook twitter

 

Home ›

embalse

Spanish government designs a new channel because thinks the old channel wouldn´t evacuate a big flood

Sun, 13/03/2005 (Las Provincias)

San Salvador will be included into new Spanish Hydrological Plan instead of dam Santaliestra

Wed, 09/03/2005 (Heraldo de Aragón)

Exploitation rules and emergency plans for the dams will be finished before 2006, according to Jucar Hydrographic Confederation

Wed, 09/03/2005 (Europa Press)

National Court demands to Ebro Hydrographic Confederation the reports about Itoiz safety

Sat, 05/03/2005 (Diario de Noticias de Navarra)

It´s the first time that the biggest dam of the Gomera (Canary Isle), 1 million of m3, is overflowed

Mon, 07/03/2005 (Europa Press)

The safety of the dams will be analyzed by group of experts

Sun, 06/03/2005 (Levante)

BASQUE COUNTRY. Basque National Party (PNV) asks for studying the proposal of construction for second channel of divert between Ulibarri and Urrunaga

Tue, 01/03/2005 (Europa Press)

The drought will test new dams

Sun, 20/02/2005 (Europa Sur)

Council says fast thaw would bring about floods if the water isn´t drawn down

Tue, 22/02/2005

Ebro Hydrographic Confederation is achieving inform in order to study the impact of the level in the dam Yesa

Wed, 16/02/2005 (El Periódico de Aragón)

  • « first
  • ‹ previous
  • …
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • …
  • next ›
  • last »
Syndicate content

Main menu

  • Front page
  • Urban waste water: improvement in collection and treatment across the EU helps reducing pollution in the environment
  • Institutions
  • Documentation
  • Training
  • Research
  • Water data/SIA
© 2021 Hispagua | Sitio web optimizado para IE8, Firefox, Chrome y Safari

Enlaces secundarios

  • Presentation
  • Site map
  • Weather
  • Legal notice
  • Accesibilidad